Low-voltage off-grid storage systems
Request YE System Selection & B2B QuoteYE Series 5 kW-Class 230V Off-Grid Storage System
YE serves compatible 230V projects that need a 5 kW-class system with storage starting at 10.24 kWh. It keeps a single-inverter positioning while offering five battery capacities up to 30.72 kWh.
YE Series 5 kW AC Hybrid Solar Power SystemOSH
Project supply details
YE Series 5 kW AC Hybrid Solar Power System for solar energy storage and project supply.
Suitable for solar storage projects, off-grid backup and distributor project supply.
- Model Range
- YE Series 5 kW
- Inverter type
- 5.5KW/51.2VACHybrid inverter
- Rated output power
- 5.5KW
YE Series 5 kW System Applications

Information Needed to Select a YE System
- Confirmation of compatible 230V site supply
- Required battery capacity and critical loads
- PV array and charging-source conditions
- Order quantity and delivery destination
230V Off-Grid Storage from 10.24 kWh
- 5.5 kW/51.2V hybrid inverter with 230VAC 50Hz pure sine wave output.
- Five battery configurations from 10.24 to 30.72 kWh.
- 120–450Vdc PV MPPT range with a maximum 500Vdc open-circuit voltage.
- Current data lists a 2-year inverter warranty and 5-year LFP battery warranty.
Applications for YE 230V Storage Systems
- Compatible 230V shop backup
- Home critical-load storage
- Small offices and distributor capacity packages
Core specifications
| Model Range | YE Series 5 kW |
|---|---|
| Inverter type | 5.5KW/51.2VACHybrid inverter |
| Rated output power | 5.5KW |
| Output waveform | Pure sine wave |
System configuration
YE Series 5 kW AC Hybrid Solar Power System technical details
System Configuration
Questions before quotation
How is YE different from LS?
Both are 5 kW-class systems, but YE storage starts at 10.24 kWh while LS starts at 5.12 kWh.
Does YE offer a 30 kWh-class configuration?
Yes. The largest current configuration is listed at 30.72 kWh.
How are YE warranties divided?
Current data lists 2 years for the hybrid inverter and 5 years for the LFP battery; order documents should confirm the final terms.